SilentNight required a complete fit out of their offices in Manchester City Centre.
The fit out included full height metal stud partitioning with sound insulation above, low level partitioning to a printer/paper store area and a tea point for the new office layout. New skirting, electrical installations and decoration provided a finish to match the existing décor.
Plumbing works included the provision of a water supply from the existing kitchen located elsewhere in the property and to install a pump waste to the proposed kitchen. PEC supplied and installed a kitchen sink including monobloc tap, all water and waste and incorporated a water supply to an American Fridge freezer. Radiators were removed and relocated to provide a more efficient heating system.